- Home
- Projects
- Powerhouse
- Wanda Power Plant Expansion and Songlin Branch Hydropower Project
Powerhouse
Wanda Power Plant Expansion and Songlin Branch Hydropower Project
Description
Wanda Power Plant Expansion and Songlin Branch Hydropower Project can not only increase the inflow of the Sun Moon Lake Reservoir to remain tourist benefit, but also expand the power efficiency of the Sun Moon Lake power system with flexible distribution of water supply for civilians and irrigation.Engineering Specifications | International Standard | Tender Unit / Proprietor | Design / Supervision | Party A | |
---|---|---|---|---|---|
1.Penstock 2.Specifications for water gates and hydraulic equipment |
(1)ASTM (2)AWS (3)JIS (4)CNS (5)ASME (6)SSPC (7)ISO |
Taiwan Power Company | Sinotech Engineering Consultants, Ltd. / Taiwan Power Company |
Taiwan Power Company |