Powerhouse

Tongxiao Power Plant

Description

In response to the government's policy of clean power generation, Taipower decided to replace the existing units with new ones, each containing two gas turbines, two heat recovery boilers and one steam turbine.
Engineering Specifications International Standard Tender Unit / Proprietor Design / Supervision Party A
(1)Heat recovery steam generator
(2)Construction specifications
(1)AISC
(2)AMSE
(3)AWS 
(4)SSPC
(5)ASTM
(6)CNS
(7)ANSI
(8)AASHTO
(9)AISI
(10)JIS
(11)DIN
(12)BS
(13)ISO
MHPS /
Taiwan Power Company
CTCI Group and MHPS /
Mitsubishi Corporation
Doosan Group
TOP