Transportation

Ligang Bridge

Description

Having encountered two typhoons during construction, TCT strived to complete the construction of Ligang Bridge, winning recognitions from the former President Ma and the local residents.

Ligang Bridge is the last of the 47 bridges scheduled to be reconstructed, also the most difficult one to be completed given to its long-span steel box girder structure and earthquake resistance along with flood control capacity. Ligang Bridge, with bicycle lanes and the landscape guardrails, turns into a new landmark and vitalizes local development in Pingtung.