As the third largest hydroelectric power station in Sri Lanka, the Upper Kotmale Hydropower Project (UKHP) is expected to provide water for irrigation and hydroelectric energy.Engineering Specifications | International Standard | Tender Unit / Proprietor | Design / Supervision | Party A | |
---|---|---|---|---|---|
Hydroelectric engineering | JIS、ASTM、ASME、 SIS、AWS、ISO | The Ceylon Electricity Board (CEB) |
Kurimoto, Ltd./CEB | Kurimoto, Ltd. | |
Duration | Completion Date | Specifications 1 - Weight | Specifications 2 - Building Height/Clear Height/Span | Specification 3 - Water Head | TCT's Work (Note: Awards) |
2008/4 | 2009/12 | Stainless steel pipe:23.2 ton, Gate (plate):955.9 ton, Trash rack:114 ton | -M | 1.Spillway gate:10.918m 2.Spillway retaining gate:1194.8n 3.Sand discharge channel retaining gate:1194.8m 4.Main dam inlet gate:8.8m 5.Suction pipe gate:48.2m 6.Tailrace gate:38m |