Sri Lanka- Gate Fabrication and Supply Project

Description

As the third largest hydroelectric power station in Sri Lanka, the Upper Kotmale Hydropower Project (UKHP) is expected to provide water for irrigation and hydroelectric energy.
Engineering Specifications International Standard Tender Unit / Proprietor Design / Supervision Party A
Hydroelectric engineering JIS、ASTM、ASME、 SIS、AWS、ISO The Ceylon Electricity Board
(CEB)
Kurimoto, Ltd./CEB Kurimoto, Ltd.
Duration Completion Date Specifications 1 - Weight Specifications 2 - Building Height/Clear Height/Span Specification 3 - Water Head TCT's Work (Note: Awards)
2008/4 2009/12 Stainless steel pipe:23.2 ton, Gate (plate):955.9 ton, Trash rack:114 ton -M 1.Spillway gate:10.918m
2.Spillway retaining gate:1194.8n
3.Sand discharge channel retaining gate:1194.8m
4.Main dam inlet gate:8.8m
5.Suction pipe gate:48.2m
6.Tailrace gate:38m