Description
In response to the government's policy of clean power generation, Taipower decided to replace the existing units with new ones, each containing two gas turbines, two heat recovery boilers and one steam turbine.Engineering Specifications | International Standard | Tender Unit / Proprietor | Design / Supervision | Party A | |
---|---|---|---|---|---|
(1)Heat recovery steam generator (2)Construction specifications |
(1)AISC (2)AMSE (3)AWS (4)SSPC (5)ASTM (6)CNS (7)ANSI (8)AASHTO (9)AISI (10)JIS (11)DIN (12)BS (13)ISO |
MHPS / Taiwan Power Company |
CTCI Group and MHPS / Mitsubishi Corporation |
Doosan Group | |
Duration | Completion Date | Specifications 1 - Weight | Specifications 2 - Building Height/Clear Height/Span | Specification 3 - Water Head | TCT's Work (Note: Awards) |
104/1~106/1 | 106/1 | (1)Fume duct 4170T (2)Chimney 2589.513T (3)Steel structure 5051.07T (4)Chimney joint 226.554T |
- | - | Fume duct, chimney and steel structure |