Transportation
Xingda Steel Bridge
Description
In order to make the coal supply system of Xingda Power Plant more economical and stable, Taipower Corporation decided to build a deep-water coal unloading wharf, the first offshore deep-water terminal in Taiwa, in the outer sea of Xingda Power Plant (see the picture below).Engineering Specifications | International Standard | Tender Unit / Proprietor | Design / Supervision | Party A | |
---|---|---|---|---|---|
- | - | Taiwan Power Company | Union-Tech Engineering Consultants Co. | Taisei Corporation | |
Duration | Completion Date | Specifications 1 - Weight | Specifications 2 - Building Height/Clear Height/Span | Specification 3 - Water Head | TCT's Work (Note: Awards) |
95/04~97/10 | 97/10 | 14,388T | - | - | (1)35 steel box girders (15m × 60m) for offshore trestle bridges (2)3 steel box girders (6m×15m) for offshore trestle bridges |