Powerhouse
Hushan Reservoir Spillway
Description
Hushan Reservoir SpillwayEngineering Specifications | International Standard | Tender Unit / Proprietor | Design / Supervision | Party A | |
---|---|---|---|---|---|
Spillway and take-out engineering design | CNS、ANSI、ASTM、ASME AWWA、AWS、AGMA、AISC AISI、NEMA、NEC、BS、DIN EN、JIS、Japan Water Gate and Iron Pipe Association、Ministry of Interior(ROC)、Ministry of Economic Affairs(ROC) | Water Resources Agency, MOEA | Sinotech Engineering Consultants, Ltd. / Water Resources Agency, MOEA | Water Resources Agency, MOEA | |
Duration | Completion Date | Specifications 1 - Weight | Specifications 2 - Building Height/Clear Height/Span | Specification 3 - Water Head | TCT's Work (Note: Awards) |
2011/11~2016/11 | 2016/11 | 1.Hydraulic equipment:512.783 ton 2.Steel lining of water transmission pipe:844.38 ton | - | 1.Trash rack:6.00m 2.Hydraulic machinery and equipment:76.80m 3.Water-control gate:16.0m | 1.2016 Public Project Quality Gold Award 2.The 16th Public Projects Gold Award 3.The 16th Public Projects Quality Award |